Home / Resources
FREE ENGINEERING TOOLS • OPEN ACCESS
Resources Hub

Engineering Resources
& Technical Tools

Size your melt power in seconds, download certified datasheets and brochures, and compare induction against fuel firing — everything a plant head needs before requesting a quotation.

6 Brochures & PDFs
28+ States & UTs
24/7 Free Access
ISO 9001:2015
01 • Free Engineering Tool

MELT SIZE QUOTE CALCULATOR

Enter your metal, batch size and target cycle time. Our sizing engine estimates power draw, energy per melt, running cost and the closest NEW TECH machine family — instantly.

MELT SPECIFICATION

KG
₹
25 min
10 min (Fast) 60 min (Economy)

Auto-updates as you change values • 70% overall system efficiency assumed

Required Power
0 kW

IGBT inverter rating

Energy / Melt
0 kWh

Per full batch cycle

Energy Cost / Melt
₹ 0

At your tariff rate

Recommended Machine Family

NT-50 Tilting Melting Furnace

Precious metal & small non-ferrous batches up to 25 kg.

25 – 50 kW Up to 25 kg 25 min cycle
Indicative Engineering Estimate

Values are indicative. Final sizing confirmed after application review.

02 • Documentation & Specs

CATALOGS & BROCHURES

Instant engineering datasheets, certified test standards, foundation drawings and layout guides — delivered to your inbox or WhatsApp on request.

General Catalog

PDF (2026 Edition)

Get PDF ↓

Gold & Silver Brochure

PDF Datasheet

Get PDF ↓

Copper Melters

PDF Technical Spec

Get PDF ↓

Rotor Brazing Guide

Pump Manufacturing

Get PDF ↓

ISO 9001:2015

Audit Certificate

Get PDF ↓

Foundation Drawings

Civil & Electrical

Get PDF ↓
03 • Technology Comparison

INDUCTION VS FUEL FIRING

A side-by-side engineering view of solid-state induction heating against gas, diesel, coal and resistance firing — across efficiency, control, cost and compliance.

Parameter Induction (NEW TECH) Gas / Oil Fired Coal / Coke
Thermal Efficiency 90 – 95% 40 – 60% 30 – 50%
Temperature Control ± 5 °C digital Manual, ± 50 °C Wide fluctuation
Start-up Time 3 – 5 minutes 20 – 40 minutes 45 – 90 minutes
Melt Cleanliness No combustion gases Flame contact oxidation Slag & contamination risk
Metal Recovery 99%+ 95 – 97% 92 – 95%
Operating Cost / kg Lowest High (fuel + losses) Highest
Maintenance Minimal, no burners Burner & flue servicing Ash handling, refractory wear
Shop-floor Emissions Zero — no flue CO₂ + fumes Particulates, soot, CO₂
Safety No open flame Open flame risk Fire & dust hazard
Footprint Compact Boiler + ducting Large + fuel storage
90%+ Wall-Plug Efficiency
±5°C Pour Temperature
0 Floor Emissions
3 min Cold Start to Melt
COMPLETE RESOURCE PACK

Need a Custom Sizing Report?

Tell us your metal, throughput and power supply — our application engineers will send a detailed datasheet pack, foundation layout and a firm factory quotation within one working day.

Datasheet Pack Foundation Layout Firm Factory Quote